We are able to assist you in database conversion projects and offer these services:
Database Conversion
Convert the existing third-party electrical power system database to ETAP. The conversion program will automatically generate a multi-layered graphical one-line diagram.
Database Validation & Verification
As the next step, load flow and short circuit runs are performed for validation of the converted data. Results are compared with the original database. For data verification purposes, the pre-existing load flow and short circuit results must be provided along with the database.
Model Presentations Setup
The auto-generated one-line diagram is based on logical layout. Some cosmetic layout changes may be required for various study requirements and engineering uses. Where applicable, the ETAP model will be arranged to include nested networks (substations) and will be set up for proper impedance, relay, and study presentations of the one-line diagram.
Model Expansion
The system model can be expanded and modified to include new substations or subsystems that have not already been modeled in the existing database / system model. This can also include as built model validation.
Database Synchronization
Our database services also provide data automation and exchange with other databases such as GIS, Master Project Database, and System Historians. These services include:
• |
Data Interpretation |
• |
Data Integration |
• |
Format Conversion & Mapping |
• |
Procedures Development |
• |
Turnkey Database Synchronization |
• |
Quality Assurance Services |
• |
Project & Technical Management |
|