Validation Case: Transient Stability Analysis
Case No. 1
Comparison with Field Measurement Data for Generator Start-Up Condition
Evaluation between the ETAP Transient Stability/Generator Start-Up simulation results and field measurement data for a nuclear generation plant.
Comparison with Field Measurement Data for Generator Start-Up Condition
Evaluation between the ETAP Transient Stability/Generator Start-Up simulation results and field measurement data for a nuclear generation plant.
Case No. 2
Comparison with I.E.E. Japan (IEEJ) Electrical Power System Standard Benchmark
Evaluation between the ETAP Transient Stability simulation results and I.E.E. Japan (IEEJ) Electrical Power System Standard Benchmark for a transmission system with a synchronous generator and the associated controls elements.
Comparison with I.E.E. Japan (IEEJ) Electrical Power System Standard Benchmark
Evaluation between the ETAP Transient Stability simulation results and I.E.E. Japan (IEEJ) Electrical Power System Standard Benchmark for a transmission system with a synchronous generator and the associated controls elements.
Case No. 3
Comparison with Field Measurements from a Digital Fault Recorder
Evaluation between the ETAP Transient Stability simulation results and actual fault-recorder measurements before and after a three-phase fault in an industrial system.
Comparison with Field Measurements from a Digital Fault Recorder
Evaluation between the ETAP Transient Stability simulation results and actual fault-recorder measurements before and after a three-phase fault in an industrial system.
Case No. 4
Comparison with 9-Bus Multi-Machine System Benchmark
Evaluation between the ETAP Transient Stability simulation results and a 9-Bus multi-machine power system benchmark (Power System Control and Stability by Anderson and Fouad) for rotor angle stability study in a multi-machine transmission system.
Comparison with 9-Bus Multi-Machine System Benchmark
Evaluation between the ETAP Transient Stability simulation results and a 9-Bus multi-machine power system benchmark (Power System Control and Stability by Anderson and Fouad) for rotor angle stability study in a multi-machine transmission system.
Case No. 5
Comparison with PTI PSS/E Simulation Results
Evaluation of simulation results between the ETAP Transient Stability and PTI PSS/E for a sequential motor dynamic acceleration study in an islanded industrial system.
Comparison with PTI PSS/E Simulation Results
Evaluation of simulation results between the ETAP Transient Stability and PTI PSS/E for a sequential motor dynamic acceleration study in an islanded industrial system.
ETAP Validation Cases & Comparison Results
(all cases in one document)
(all cases in one document)