Support

support substation automation system software faqs & tutorials substation automation system software faqs & white papers

FAQs & White Papers


The FAQs & White Papers section is a repository for all types of information concerning ETAP power systems software. Find information on short circuit software, arc flash software, transient stability software, and power flow software. The information is conveniently broken down by topic so that you can easily find anything you need pertaining to electrical engineering software.

Installation and Licensing
System Modeling
Arc Flash Analysis
Load Flow Analysis
Short-Circuit Analysis
Star Device Coordination Analysis
Cable System
Motor Starting Analysis
Transient Stability Analysis / Parameter Estimation
Panel System
Data Exchange and Conversion
Real-Time
Reliability Assessment
Library


Installation and Licensing

1 Installation guide for ETAP 5.5.6 with USB Key - ETAP-OTI 1600 Installation guide for ETAP 5.5.6 with USB Key - ETAP-OTI 1600 (939 KB)
Complete installation guide using the “USB Key – ETAP-OTI 1600” model.
2 Installation guide for ETAP 5.5.6 - replacing your key with the USB key - ETAP-OTI 1600 model Installation guide for ETAP 5.5.6 - replacing your key with the USB key - ETAP-OTI 1600 model (676 KB)
Complete Installation Guide for ETAP 5.5.6 using the “USB Key – ETAP-OTI 1600” model.
3 USB driver installation guide for USB key ETAP-OTI 1410 USB driver installation guide for USB key ETAP-OTI 1410 (557 KB)
Complete Installation Guide for ETAP 5.5.6 using the “USB Key – ETAP-OTI 1410” model.
4 ETAP License Manager does not start ETAP License Manager does not start (405 KB)
Instructions on how to troubleshoot when the ETAP License Manager doesn't start.
5 Installation guide for ETAP 5.5.6 License Manager using USB key - ETAP-OTI 1410 or parallel port key Installation guide for ETAP 5.5.6 License Manager using USB key - ETAP-OTI 1410 or parallel port key (690 KB)
Complete Installation Guide for ETAP 5.5.6 License Manager using USB Key – ETAP-OTI 1410 or Parallel Port Key.
6 Failed to receive authorization from ETAP License Manager Failed to receive authorization from ETAP License Manager (456 KB)
Instructions on how to troubleshoot with failed to receive authorization from the ETAP License Manager.
7 ETAP 5.5.5 License Manager installation guide ETAP 5.5.5 License Manager installation guide (374 KB)
Installation guide for ETAP License Manager 5.5.5. For “ETAP-OTI 1410” keys.
8 A separate network license key for LAN and WAN A separate network license key for LAN and WAN (110 KB)
ETAP 5.5 distinguishes if a network license key is used on a LAN or WAN network.
9 ETAP 5.5 License Manager compatibility with earlier releases ETAP 5.5 License Manager compatibility with earlier releases (76 KB)
ETAP 5.5 comes with the new License Administrator and Wizard, which allows users to monitor and administer access to your ETAP license.
10 Reset the ETAP 7.0.0 License Manager Reset the ETAP 7.0.0 License Manager (113 KB)
Instructions on how to reset the License Manager.
11 ETAP Upgrade & Support contract agreement ETAP Upgrade & Support contract agreement (112 KB)
Information about what is included in the ETAP Upgrade and Support Agreement.
top

System Modeling

1 Use Microsoft Access Database for Crystal Reports format Use Microsoft Access Database for Crystal Reports format (115 KB)
ETAP stores the output report data in Microsoft Access databases so that they may be viewed using the Crystal Reports Formats.
2 Most common webinar questions Most common webinar questions (193 KB)
Answers to the most commonly asked questions regarding ETAP webinars.
  top
 

One-Line Diagram

   
  1 Building a One-Line Diagram Building a One-Line Diagram (163 KB)
Quickly view one-line construction with unique tips.
  2 Using Hyperlinks in ETAP projects Using Hyperlinks in ETAP projects (233 KB)
Instructions on how to use hyperlinks in ETAP projects.
  3 Insert legends, text, and tables into one-line diagrams using OLE and ActiveX objects Insert legends, text, and tables into one-line diagrams using OLE and ActiveX objects (198 KB)
Instructions on how to use OLE and ActiveX objects.
  4 Simplify one-line diagram connections using remote connectors Simplify one-line diagram connections using remote connectors (119 KB)
Instructions on how to use remote connectors in ETAP.
  5 One-Line Diagram Presentation One-Line Diagram Presentation (444 KB)
One-Line Diagram is the method of representation of modeling the electrical system in ETAP for network analyses.
  6 Choose the correct bus level Choose the correct bus level
How to choose the correct bus level.
  top
 

New Project

   
  1 Send ETAP project files Send ETAP project files (458 KB)
Instructions on how to send ETAP project files.
  top
 

Elements

   
  1 Project View (Part 5 - Components): Last Part Project View (Part 5 - Components): Last Part (124 KB)
Working with components in ETAP.
  2 Composite Network Composite Network (382 KB)
The concept of “Composite Network” was integrated in ETAP to provide flexibility in simplifying and organizing the electrical One-Line diagram.
  3 Series capacitor Modeling Series capacitor Modeling (74 KB)
How to model a series capacitor with the help of an impedance branch in ETAP.
  4 Model a Shunt Reactor Model a Shunt Reactor (79 KB)
How to model a shunt reactor with the help of a static load in ETAP.
  5 Model a zip-zag grounding transformer Model a zig-zag grounding transformer (87 KB)
How to model a zig-zag grounding transformer using ETAP
  6 Element Properties Element Properties (272 KB)
How to effectively edit your elements in ETAP.
  top
 

3-D Database

   
  1 Project View (Part 1 - Presentations) Project View (Part 1 - Presentations) (567 KB)
All elements associated in an ETAP project are accounted in the Project View window.
  2 Project View (Part 2 - Configurations) Project View (Part 2 - Configurations) (506 KB)
Working with configurations in ETAP.
  3 Project View (Part 3 - Study Cases) Project View (Part 3 - Study Cases) (251 KB)
Working with study cases in ETAP.
top

Arc Flash Analysis

1 Arc Flash Arc Flash (163 KB)
Introduction to ETAP Arc Flash Hazard Analysis module with instructions on how to setup arc flash calculations.
2 Arc Flash Analysis Done Right Arc Flash Analysis Done Right (1.87 MB)
Arc flash analysis system modeling and studies for existing systems.
3 Arc Flash - FCT Not determined Arc Flash - FCT Not determined (981 KB)
The most common roadblocks to finding fault clearing time in arc flash calculations
4 Arc Flash Standard Comparison Arc Flash Standard Comparison (172 KB)
Comparison between NFPA 70E-2000 and IEEE 1584-2002 standards for arc flash analysis
top

Load FLow Analysis

1 Load Flow Analysis Load Flow Analysis (289 KB)
Conduct decisive power flow analysis.
2 Generate load lists for an incomplete system Generate load lists for an incomplete system (338 KB)
The Load Analyzer module is designed as a generalized load-list to report load-schedules for power system components such as switchgear, MCC, transformers, cables, lines, panels, and more.
top

Short-Circuit Analysis

1 Short-Circuit Analysis Short-Circuit Analysis (286 KB)
Learn how to do your fault analysis quicker and more effective in ETAP.
top

Star Device Coordination Analysis

1 Protective Device Coordination (Star) Protective Device Coordination (Star) (233 KB PDF)
Viewing a TCC in Star.
2 Export protective device settings to Excel Export protective device settings to Excel (231 KB)
Preview and print the protective device settings data using Crystal Reports format or Microsoft Excel.
3 PowerPlot v2.5 tap addition must be a number PowerPlot v2.5 tap addition must be a number (50 KB)
Tap addition must be a number error message.
4 The Curve of a Phase Overcurrent Device in a TCC Plot The Curve of a Phase Overcurrent Device in a TCC Plot (274 KB)
This document describes tips and pointers on how to display the time-current curve of a phase overcurrent device in a
Ground TCC Plot.
top

Cable System

 

Cable Pulling

   
  1 Create a cable pulling project Create a cable pulling project (177 KB)
This document describes how to create a cable pulling project in ETAP.
top

Motor Starting Analysis

1 Motor Acceleration Analysis Motor Acceleration Analysis (214 KB)
An introduction to ETAP Motor Acceleration.
2 Model a Load Torque Model a Load Torque (157 KB)
Instructions on how to model load torque in ETAP.
top

Transient Stability Analysis / Parameter Estimation

1 Parameter Estimation Parameter Estimation (497 KB)
ETAP can be able to estimate a corresponding equivalent circuit model of the motor using the Parameter Estimation module.
2 Transient Stability – Events & Actions Transient Stability – Events & Actions (995 KB)
Simulate any occurrence in an electrical system that may affect the stability limit of the power system in the Transient Stability
module of ETAP.
3 Transient Stability – Relay Controlled Actions Transient Stability – Relay Controlled Actions (468 KB)
The actions of relays can be integrated in the transient stability to resemble the true power system real operating conditions.
4 Governor limit checking in transient stability studies Governor limit checking in transient stability studies (207 KB)
Governor limits are exceeded during initial condition calculations.
top

Panel System

1 Panel Systems Panel Systems (342 KB)
Model single and multiple phase panel schedules.
top

Data Exchange and Conversion

1 Convert PowerPlot projects to ETAP Star Convert PowerPlot projects to ETAP Star (820 KB)
How to convert Time Current Curves (TCC) in existing PowerPlot projects to ETAP Star
2 Export a one-line diagram to DXF format

Export a one-line diagram to DXF format (200 KB)
How to convert an ETAP one-line diagram into an AutoCAD DXF file.

top

Real-Time

1 Build and validate switching sequences in ETAP Build and validate switching sequences in ETAP (298 KB)
Switching Management allows the dispatcher to build a complete switching program using a graphical user interface and execute the switching plan all in one step.
2 The scan intervals for ETAP Real-Time The scan intervals for ETAP Real-Time (96 KB)
The scan intervals of ETAP Real-Time are user-definable. ETAP Real-Time scan time settings depend mainly on the communication network and the type of interface configuration.
3 Interface ETAP Real-Time with existing SCADA systems Interface ETAP Real-Time with existing SCADA systems (66 KB)
An explanation of how ETAP Real-Time interfaces with existing SCADA systems.
4 ETAP Real-Time and field metering device communication ETAP Real-Time and field metering device communication (64 KB)
Explanation of how ETAP Real-Time communicates with field metering devices.
top

Reliability Assessment

1 Active and passive failure rates Active and passive failure rates (347 KB)
Analysis of customer failure statistics shows that failures in distribution systems contribute as much as 90% towards the unavailability of supply to a load as compared with the rest of the electric power system. These statistics reinforce the need for reliability evaluation of distribution systems.
top

Library

1 Project View (Part 4 - Libraries) Project View (Part 4 - Libraries) (159 KB)
Working with ETAP libraries.
   
 

Circuit Breaker and Trip Devices

   
  1 Assign a retrofit trip device Assign a retrofit trip device (340 KB)
Instructions on how to assign a retrofit trip unit to a low voltage circuit breaker.
  2 Adding LV MCCB to the Library Adding LV MCCB to the Library (1.34 MB)
Adding LV MCCB to the Library (With Thermal-Magnetic Trip Unit).
  3 Adding a Solid State Trip Device to the Library

Adding a Solid State Trip Device to the Library (1.36 MB)
Details on how to add a solid state trip device to the ETAP library.

   
 

Cable

   
  1 Cable library structure Cable library structure (144 KB)
How to navigate through the ETAP Cable Library.
   
top

This information has been provided by ETAP Engineers to enhance your experience using ETAP software.

Please contact support.etap.com if you have any questions or need more information.

Adobe Acrobat Reader required to view FAQ's.