Resource Center

ETAP Arc Flash Auto Evaluation

ETAP Arc Flash Auto Evaluation

Automated Arc Flash Energy Evaluation - When performing protection and coordination studies it is difficult to anticipate potential arc flash coordination issues due to the differences between the arc and bolted fault currents. Arc Flash Auto solution automatically evaluates arc-flash incident energy and equipment arc flash damage points to quickly resolve these conflicts limiting the number of scenarios required or even removing the need for an isolated arc flash study.

Underground Conductor Electromagnetic Fields Analysis

Underground Conductor Electromagnetic Fields Analysis

The ETAP electromagnetic field exposure analysis tool is integrated with the underground cable systems (UGS) analysis module, and it determines the worst-case electromagnetic fields produced by conductors in underground raceways. The tool handles various 3-phase conductor layouts including flat and trefoil as well 1/C and 3/C 1-phase cables, dc cables, etc. The tool uses balanced & unbalanced load-flow currents and angles to determine the location and surface-level height of the worst-case magnetic field because of all conductors in the raceway.

Design & Operate - Continuous Digital Twin Journey

Design & Operate - Continuous Digital Twin Journey

56:04 Webinars

ETAP Digital Twin is an integral building block in all stages of an electrical system’s life cycle. Join & learn how you can leverage it for shortened design time, validation & transition of digital twin model to operations, early decision support, identification of operation problems & their cause, accelerated engineer & operator training, asset performance monitoring & optimization. 

ETAP Automation Company of the Year 2021 Award

ETAP Automation Company of the Year 2021 Award

Frost & Sullivan’s Company of the Year Award recognizes the market participant that exemplifies visionary innovation, market-leading performance, and unmatched customer care. We are proud to share, that ETAP won the prestigious award, honoring the continuously strong performance and excellence in best practices in the GCC Electrical Power System Analysis & Optimization Industry.

Dynamic Response Analysis using UDM Scope Plot View

Dynamic Response Analysis using UDM Scope Plot View

49:19 Webinars

ETAP UDM is used to build complex control diagrams for machines & renewable energy systems via a graphical editor and includes solvers for simulating system dynamics. Learn how to use UDM Plot View to compare & analyze these dynamic simulation results from single or multiple cases in a quick & efficient manner.

ETAP Power System Design Solutions

ETAP Power System Design Solutions

45:06 Webinars

Learn about ETAP's one-stop solution with intelligent interface views and core capabilities to create, configure, customize, and manage the digital twin model of your electrical power system.

ETAP 20.6 New Features and Capabilities

ETAP 20.6 New Features and Capabilities

44:37 Webinars

As a major update to the ETAP 20 series, ETAP 20.6 offers impressive new solutions and features, including 100's of enhancements and time-saving improvements, as well as extensive additions to the equipment libraries.

eTraX™ – Railway Systems

eTraX™ – Railway Systems

41:59 Webinars

This webinar introduces ETAP eTraX™, integrated solution for design, planning and operation of Rail Traction Systems. eTraX is utilized by railway owners, operators and engineering consultants to analyze, evaluate and monitor innovations and technologies utilized to increase energy efficiency, optimize substation capacity and improve train performance.  

ETAP 20.5 New Features and Capabilities

ETAP 20.5 New Features and Capabilities

59:06 Webinars

This webinar highlights integrated power analysis modules, electrical safety capabilities, and operational compliance solutions, released in ETAP 20.5. Learn about major features & capabilities plus 100’s of enhancements and time-saving improvements added to existing ETAP modules

NFPA 70E 2021 – Hazard Evaluation of Stored Capacitor Energy

NFPA 70E 2021 – Hazard Evaluation of Stored Capacitor Energy

59:26 Webinars

This webinar provides a summary of the major changes to NFPA 70E 2021 and demonstrates how engineers can use ETAP 20.5 to evaluate the impact of connected and disconnected capacitor energy, calculate arc blast hazard related protection boundaries and how to print Capacitor Hazard Labels in compliance with NFPA 70E 2021. 

Distribution Automation with Model-Based Volt/Var Optimization (VVO)

Distribution Automation with Model-Based Volt/Var Optimization (VVO)

40:50 Webinars

This webinar discusses industry challenges and benefits of a model-based VVO, including practical applications for electric distribution systems. Gain valuable insights and benefits from ETAP customers enjoying a proactive reduction in energy waste, reduced CO2 emissions, consumption reduction, and extended equipment lifetime.

Intelligent Microgrid Management - Part 2

Intelligent Microgrid Management - Part 2

26:45 Webinars

This webinar examines the microgrid controller’s architecture, hardware deployment workflow, and a range of advanced monitoring tools. Learn how ETAP Digital Twin platform enables the design and deployment of ETAP's Intelligent μGrid™ solution.

Enterprise Protection & Asset Management System

Enterprise Protection & Asset Management System

51:03 Webinars

Protection assets are critical to the safety and reliability of power systems. Often utilities face the challenge of maintaining and managing protection equipment and rely upon different systems to monitor, manage, and optimize protection settings. ETAP eProtect™ solution provides lifecycle management of protection assets by combining a centralized protection settings management system with automated protection and coordination tools. eProtect allows for device management, relay settings optimization, and management of change across the enterprise. 

Motor Protection - Characteristics & Applications

Motor Protection - Characteristics & Applications

57:53 Webinars

This webinar presents the criterion and industry guidelines for motor protection in medium and low voltage systems, typical induction motor protection schemes and suggested settings for protective devices. The application of Automated Protection & Coordination evaluation tool for design, verification, and correction of settings are also demonstrated.

iDLS™ - Intelligent Load Shedding

iDLS™ - Intelligent Load Shedding

32:52 Webinars

Learn how ETAP iDLS offers an intelligent model-driven load curtailment solution with optimization techniques to shed the minimum required distribution feeder loads based on reliability indices, quality of supply, and availability of distributed generation.

20 of 529 results