Case No. 1
Comparison with Field Measurement Data for Generator Start-Up Condition
Evaluation between the ETAP Transient Stability/Generator Start-Up simulation results and field measurement data for a nuclear generation plant.
Case No. 2
Comparison with I.E.E. Japan (IEEJ) Electrical Power System Standard Benchmark
Evaluation between the ETAP Transient Stability simulation results and I.E.E. Japan (IEEJ) Electrical Power System Standard Benchmark for a transmission system with a synchronous generator and the associated controls elements.
Case No. 3
Comparison with Field Measurements from a Digital Fault Recorder
Evaluation between the ETAP Transient Stability simulation results and actual fault-recorder measurements before and after a three-phase fault in an industrial system.
Case No. 4
Comparison with 9-Bus Multi-Machine System Benchmark
Evaluation between the ETAP Transient Stability simulation results and a 9-Bus multi-machine power system benchmark (Power System Control and Stability by Anderson and Fouad) for rotor angle stability study in a multi-machine transmission system.
Case No. 5
Comparison with PTI PSS/E Simulation Results
Evaluation of simulation results between the ETAP Transient Stability and PTI PSS/E for a sequential motor dynamic acceleration study in an islanded industrial system.